Homepage | Set Home | Add to Favorites
Member

Guangzhou 247 International Trading Co., Ltd.


Products
  • No Category
Search
 

Friends links
  • No link

1kg/Box Plain Shank Electro Galvanized Concrete Nail
Click image to view full size image
Product: Views:2551kg/Box Plain Shank Electro Galvanized Concrete Nail 
Unit price: Negotiable
MOQ:
Quantity:
Delivery date: Since the payment date Days delivery
Valid until: Long-term effective
Last updated: 2017-11-14 20:54
  Inquiry
Details
1kg/box Plain Shank Electro Galvanized Concrete Nail 

1. Size: 1/2"-6"

2. Material: High quality # 40-45 # medium carbon steel manufacturing, through special processing.

3. Performance: Has the very strong hardness and good toughness. Medium carbon steel hardness to over HRC50; Shear strength t p 980 Mpa

4. Nails surface finsihing: Galvanized, black, Bluing

5. Size supply: 1", 1.5", 2", 3", 4" 5" 6"

6. Packing: 20kg or 25 kg/carton, also can as customers' requirment.

7. Lead time: 20-25 days for a container

8. Loading quantity: 26 tons ( 20ft contanier)

9. Product packaging: Carton packaging, 25 kg/ctn or as required

10. Application: Suitable for decoration, decoration industry, hard wood, light wooden keel of the connection. Suitable for hard wood, bricks and cement mortar components. Widely used in civilian and military construction of water and electricity installation and decoration.
Item NO Name Size(cm) Weight(kg) Measurement(cm)
E0039 concrete nail 1.6*18 12.5 370*270*130
E0040 concrete nail 1.8*20 12.5 370*270*130
E0041 concrete nail 2*20 12.5 370*270*130
E0042 concrete nail 2*2.5 12.5 370*270*130
E0043 concrete nail 3*20 12.5 370*270*130
E0044 concrete nail 3*25 12.5 370*270*130
E0045 concrete nail 3*30 12.5 370*270*130
 
Product name Galvanized Concrete Nails/Black Concrete Nails
Material: steel
Size: 1/2"-6"
Type: round head with smooth shank;flat head with grooved shank
Treatment: electro galvanized,hot dipped galvanized,black
Packing: 20-25 Kgs/Carton or 50lbs/Carton 48cartons/Pallet
Production QTY: 500tons/month
MOQ: 5 Tons
Delivery time: 25days after downpayment
Application: construction
Remarks No rust





Inquiry